Skip to content
📞 1300 987 789 | sales@petroindustrial.com.au
📞 1300 987 789 | sales@petroindustrial.com.au
Fuel Supply & Generator Solution for the Mining Industry

Fuel Supply & Generator Solution for the Mining Industry

Our client, a prominent player in the mining industry, required a robust and efficient fuel supply system to sustain Light and Heavy Vehicle refuelling along with some  generators operating on-site. PETRO Industrial was entrusted with the task of designing and implementing a comprehensive solution tailored to meet their specific needs.

Diesel Storage and Dispensing Tank Farm for Vehicles and Generators, by PETRO Industrial

We designed this innovative bulk fuel farm, featuring 5 PETRO LT Series 68,000L Bulk fuel tanks seamlessly interconnected with linking kits. Each tank was equipped with TRAP breather assemblies to efficiently regulate moisture and prevent dust ingress, safeguarding the integrity of the stored diesel. The Fuel Farm was strategically designed to facilitate Light and Heavy Vehicle Refueling.

Heavey vehicle at central control module and unloading fuel pump

Complementing the fuel storage setup, a 6m Dangerous Goods store was engineered to serve as the central control module for the Fuel Farm as well as house the unloading pump.

This DG Store not only ensures compliance with safety regulations but also houses two high masts equipped with Low and High flow, dual hose nozzles and one High flow nozzle, contributing to a comprehensive and secure fuel distribution system.

PETRO Cube for diesel supply to two generators

Additional to the Fuel Farm tanks, a fully customised PETRO LT Series 30,000L Bulk fuel tank was installed to feed a PC Cube 1,100L daytank that supplies 2 generators on site. All necessary transfer systems were installed in the full height, lockable pumpbay.

All refuelling points were equipped with fire extinguishers, safety eye wash and shower stations. PETRO Industrial completed the setup with Spill Containment Units and the refuelling points and near the 6m Dangerous Goods store. Environmentally complying to all standards.

Safe Storage:

All pumping equipment found its home in a dedicated 6m Dangerous Goods Store. This secure facility housed NMI approved meters, an iPETRO Pro fluids management system, tank gauging, and five duty standby transfer pumps, guaranteeing compliance with industry standards and safety regulations.

Fuel dispensing, monitoring and gauging by PETRO Industrial

Efficient Monitoring:

Our integrated solution included a sophisticated tank gauging system, providing real-time visibility into fuel levels. This ensures the client can proactively manage fuel supply, minimizing downtime and optimizing operational efficiency.

Enhanced Containment Measures:

To bolster safety during road tanker unloading and light vehicle refueling, our solution incorporated spill containment units. These units provide an added layer of protection, mitigating the risk of spills and ensuring compliance with stringent environmental regulations.

Accessibility and Safety Features:

The fuel tanks were strategically fitted with easy-access walkways, facilitating regular checks and maintenance. Moreover, emergency spill kits, eye wash stations, safety showers and fire extinguishers were positioned for quick response to unforeseen situations, prioritizing safety and environmental protection.

Fuel Tank Farm designed, installed and commissioned by PETRO Industrial

OUTCOME:

The implementation of our comprehensive fuel farm has significantly elevated our client's operational capabilities. With a seamless and secure fuel supply infrastructure, they can now power their generators efficiently and keep their vehicle fleet fuelled up, ensuring uninterrupted operation.

The attention to safety features, compliance, and accessibility underscores PETRO Industrial's commitment to delivering tailor-made solutions that not only meet but exceed our clients' expectations. This case exemplifies our expertise in providing holistic solutions for complex fuel storage and supply requirements in demanding industrial settings.

In closing, this case study highlights our successful collaboration and impactful solutions. For more information or to discuss how we can tailor our expertise to your unique needs, contact our team.

We're eager to contribute to your success. Reach out today at sales@petroindustrial.com.au | 1300 987 789.

Previous article Empowering Mining Operations with PETRO Fuel Storage Solution
Next article Multiple Fuel Farms and a Lubrication Tank for a Mining Project

More case studies

  • On-site CUBE fuel storage tank for landscaping project
    September 15, 2026

    On-Site Fuel Storage Supporting a Large-Scale Landscaping Project

    Helping Transform a New Retirement Village into a Welcoming Community

    As construction nears completion, extensive landscaping is often the final step in transforming a new development into a welcoming community. In this representative project scenario, a commercial landscaping contractor was tasked with completing gardens, communal spaces and surrounding grounds across a large retirement village. With multiple crews and diesel-powered machines working throughout the site, reliable access to fuel was essential. PETRO Hire provided a flexible on-site diesel storage and fuel-management solution, helping keep equipment fuelled, crews productive and the landscaping program moving toward completion.

    Read now
  • 2 x PETRO HIRE Cube fuel storage tanks on a construction site
    September 15, 2026

    On-Site Fuel Storage that grows With the Project

    Fuel storage that grows WITH the project

    Major infrastructure projects need reliable fuel without the cost and commitment of permanent infrastructure. In this representative water pipeline project, PETRO Hire provided two 4,500-litre self-bunded PC Cube tanks, delivering 9,000 litres of secure on-site fuel storage for heavy construction equipment. The flexible, relocatable solution kept machinery fuelled, reduced downtime and adapted to changing site requirements—demonstrating how PETRO Hire can scale fuel infrastructure as your project grows, changes and progresses.

    Read now
  • 12,000L LT Tank for the storage and transfer of emulsion
    September 11, 2026

    More Than a Tank: A Custom 12,000L Emulsion Storage Solution

    Purpose-Built Pumping and Temperature Control for a Two-Year Hire

    When specialised products require precise storage, temperature management and controlled transfer, a standard tank-and-pump solution may not be enough. In this project, PETRO Hire was approached to provide a 12,000L LT Tank for the storage and transfer of temperature-sensitive emulsion over an initial two-year hire period. Rather than supplying off-the-shelf equipment, PETRO engineered a purpose-built package incorporating customised pumping equipment, insulated and lagged pipework, integrated controls and protected service infrastructure—delivering a complete storage and transfer solution designed specifically around the customer’s process.

    Read now