Installation & Commissioning

From delivery to go-live, we install what we design and bring it fully online

We don't just design fuel storage and dispensing facilities, we deliver them. PETRO Industrial's in-house team installs above ground and self bunded tank systems on your site, then commissions every component to ensure it's calibrated, tested and ready to run from day one.

  • Precision Installation

    Tanks positioned and connected to spec

  • Full System Commissioning

    Every component tested before go-live

  • Ready from Day One

    Calibrated, trained and operational

Why Installation & Commissioning Matters?

Contact our team
PETRO fuel facility installed on site with self bunded tank and dispenser

A facility is only as good as its install

The best-designed fuel facility can still underperform if it isn't installed and commissioned correctly. Poorly routed cabling, uncalibrated meters, or a rushed commissioning process create safety risks, compliance issues and costly downtime down the line.

Because PETRO designs and builds the equipment we install, commissioning isn't a handoff to a third party. It's the final stage of the same engineering process, delivered by the team that understands the system inside and out.

Our Installation & Commissioning Capability

PETRO tank systems being delivered and placed on a prepared concrete pad by crane

Installation

  • Tank delivery & placement (above ground & self bunded)
  • Power & electrical connection
  • Cabling and cable tray installation
  • Traffic-safe cable routing
  • Site safety & hazardous area compliance during works
  • Civil works, tank pad preparation, bunding & pipework
PETRO technician commissioning a fuel dispensing system on site

Commissioning

  • Full system calibration
  • Duty cycle testing (complete fuel cycle run to confirm no air in the system)
  • Meter accuracy verification
  • Nozzle & auto-nozzle calibration
  • Fuel management system setup, including user access, fuel tags and VMI dashboard configuration
  • Key personnel training on system operation

One Team, from Design to Go-Live

Backed by Experience

PETRO Industrial diesel fuel tank on a truck

What is included in our installation & commissioning service

Talk to our team for more detail on our capabilities

PETRO Industrial manages the full installation and commissioning process for above ground and self bunded fuel systems, ensuring your facility is safe, compliant and fully operational before we hand over the keys.

Request an installation
  • Site Delivery & Tank Placement

    Careful delivery and positioning of tanks on your site, coordinated around your operational requirements and site access.

  • Electrical & Cabling Installation

    Power connection, cabling and cable tray installation, with all cabling routed away from traffic areas for a safe, compliant site.

  • System Calibration & Duty Cycle Testing

    Every meter, pump and nozzle is calibrated and run through a full duty cycle to confirm accurate flow and a system free of air before go-live.

  • Fuel Management & iPETRO Setup

    Configuration of your fuel management system, including user access, fuel tags and VMI dashboard setup, so your team has full visibility from day one.

How we install & commission your facility

Every installation follows a proven process to get your facility safely and reliably online.

  1. Delivery & Placement

    Tanks and equipment are delivered and positioned on site according to the approved design.

  2. Cabling & Power

    Our team installs power connections, cabling and cable trays, routed safely away from traffic areas.

  3. Commissioning & Testing

    The system is calibrated and run through a full duty cycle, with meters, pumps and nozzles tested for accuracy.

  4. Training & Handover

    Key personnel are trained on system operation, fuel management setup and day-to-day use before handover.

PETRO service vehicle beside a self bunded diesel tank at an airport

Industries We Support

PETRO's installation and commissioning teams deliver fuel facilities for organisations that depend on reliable infrastructure from day one.

  • Transport & Logistics
  • Government & Councils
  • Mining & Resources
  • Construction
  • Utilities & Critical Infrastructure
  • Fuel Suppliers & Terminals
Speak to our team
  • Send Us an Email

    Send your requirements & we’ll get back to you with a quote.

  • Give Us a Call

    Talk to our team today for advice or to book an installation.

    +61 (07) 3204 9558
  • Onsite Support

    In-person support for installation and commissioning.

  • National Locations

    Technicians and engineers located across Australia for a fast response.

Map of Australia showing PETRO locations in Queensland, New South Wales, Victoria and Western Australia

Strategically
located across
Australia

QLDNSWVICWA

Why Should You Choose PETRO?

Because your fuel facility deserves more than an install, it deserves PETRO precision.

Fuel tanks, fuel systems, servicing and parts, all in one place.

  • Design, Build & Install Under One Roof

    One team from concept to commissioning.

  • In-House Engineers

    Mechanical and electrical expertise on staff.

  • iPETRO-Ready from Commissioning

    Connected to fuel management from day one.

  • Hazardous Area Certified

    Safe, compliant work by qualified pros.

  • National Delivery

    Equipment and crews delivered Australia wide.

  • Proven Track Record

    Storage, dispensing & infrastructure.

Let's Get Your
Facility Online

From delivery to duty cycle, PETRO Industrial installs and commissions your fuel facility with the same precision it was designed with.

Book an installation

Frequently asked questions

Do you install equipment you didn't design?

Details on your fleet size and vehicle mix, expected flow rates, fuel types to be stored, and any known site constraints help us get started. Our engineers will guide you through anything else needed during consultation.

How long does commissioning take?

Timeframes depend on the size and complexity of your site. We confirm a schedule during consultation.

What training is included?

We train your team on safe operation and day-to-day use of the installed system before handover.

Is our team set up on iPETRO from day one?

Yes. Your team is onboarded to iPETRO as part of commissioning so you can start managing fuel from go-live.

Do you provide support after go-live?

Yes. Our team is available after go-live for support, servicing and maintenance.