11,000L Dual Generator Feed Tank

11,000L Dual Generator Feed Tank

PETRO Industrial custom fitted this 11,000L PETRO  Fuel Tank with a Dual Solar Powered Pump System to serve as a day tank.

Accompany Mark, our Major Projects leader, on an exclusive tour of one of our specialized, compact projects.

Introducing the PETRO Self Bunded Tank, meticulously designed to ensure the continuous operation of 2 Generator Sets, all fully automated.

Equipped with a tailor-made electrical board, an impressive array of solenoid valves, a cutting-edge solar inverter, a dependable deep cycle battery, state-of-the-art high and low-level alarms, and a high-performance battery charger – this is the ultimate, all-inclusive solution.

Dual Generator Feed System from a PETRO Industrial Cube Tank

THE PETRO BUILD

The Tank is fitted with a 12 Volt Solar Powered System which consists of:
  • 2 x Solar Panels.
  • Solar Converter.
  • Battery Charger as back up.
  • Electrical Control Board where the pumps can be controlled manually or automatically.
  • 2 x 12V Pumps.
  • 2 x Solenoid Valves on Suction to avoid syphoning.
  • 2 x Foot Valves and Strainers.
  • Bridging Solenoid so that either pump can operate both systems in the event of one pump being down.
  • Low-level probe to shut down the pumps and set off an alarm when the fuel level reaches the low-level point.
PETRO Industrial has the capacity to tailor commercial refuelling solutions to your business' applications.

 

Contact our team of hand-picked service specialists today!

 

PETRO Industrial Electrical Control Board
    PETRO Industrial Cube Tank fitted with Solar Panels

     

    Check out this short video below, detailing the build of a PETRO T11 Dual Generator Feed tank:

    You can always rely on PETRO for a solution!

    1300 978 789

     

    TRANSCRIPT:

    "Ok, we’ve got a project here which is an 11,000 litre Self Bunded Fuel Tank, set up for daytank transfer.

    So what we are doing is, feeding two generators.

    This application is 12Volt, so we have solar power. Two solar panels down there, solar converter here, battery charger under here as a backup.

    Electrical control panel, so we have duty standby pumps, so our Control board is capable of automatic and manual pump control.

    Here we have Pump 1 and Pump 2 selection. Controls here to manually start and stop the pump from priming.

    So stepping back through here, everything is controlled by 12 Volt solenoid valves and all linked back to the electrical control board.

    So what is happening, is we have pump one, pump two, we have solenoid valves on either side of the suctions to control syphoning or to avoid syphoning.

    We have foot valves in the tank, we have strainers. We also have a bridging solenoid here so that either pump can operate in closed systems.

    So, in the event that one pump is down, we can supply two lines. We have set our solar panels up on top of the tank as you can see there.

    We have a low level probe over here. So this probe this sensing fuel in the tank, it will shut down should the tank be on low level and set off an alarm, protect the pumps.

    So this is it."

    Previous article Fuel Filtration Transfer Tank with PLC – PETRO Industrial
    Next article PETRO On-Site Tank Maintenance Services

    More case studies

    • On-site CUBE fuel storage tank for landscaping project
      September 15, 2026

      On-Site Fuel Storage Supporting a Large-Scale Landscaping Project

      Helping Transform a New Retirement Village into a Welcoming Community

      As construction nears completion, extensive landscaping is often the final step in transforming a new development into a welcoming community. In this representative project scenario, a commercial landscaping contractor was tasked with completing gardens, communal spaces and surrounding grounds across a large retirement village. With multiple crews and diesel-powered machines working throughout the site, reliable access to fuel was essential. PETRO Hire provided a flexible on-site diesel storage and fuel-management solution, helping keep equipment fuelled, crews productive and the landscaping program moving toward completion.

      Read now
    • 2 x PETRO HIRE Cube fuel storage tanks on a construction site
      September 15, 2026

      On-Site Fuel Storage that grows With the Project

      Fuel storage that grows WITH the project

      Major infrastructure projects need reliable fuel without the cost and commitment of permanent infrastructure. In this representative water pipeline project, PETRO Hire provided two 4,500-litre self-bunded PC Cube tanks, delivering 9,000 litres of secure on-site fuel storage for heavy construction equipment. The flexible, relocatable solution kept machinery fuelled, reduced downtime and adapted to changing site requirements—demonstrating how PETRO Hire can scale fuel infrastructure as your project grows, changes and progresses.

      Read now
    • 12,000L LT Tank for the storage and transfer of emulsion
      September 11, 2026

      More Than a Tank: A Custom 12,000L Emulsion Storage Solution

      Purpose-Built Pumping and Temperature Control for a Two-Year Hire

      When specialised products require precise storage, temperature management and controlled transfer, a standard tank-and-pump solution may not be enough. In this project, PETRO Hire was approached to provide a 12,000L LT Tank for the storage and transfer of temperature-sensitive emulsion over an initial two-year hire period. Rather than supplying off-the-shelf equipment, PETRO engineered a purpose-built package incorporating customised pumping equipment, insulated and lagged pipework, integrated controls and protected service infrastructure—delivering a complete storage and transfer solution designed specifically around the customer’s process.

      Read now