Overview

A valued customer returned to PETRO Industrial with a challenge: expanding their fuel storage capacity adjacent to the existing fuel farm that PETRO originally commissioned several years ago. Over the years, PETRO has not only maintained the facility but also ensured its optimal performance, keeping pumping equipment in perfect working condition and replacing filters regularly. This dedication has been key to maximising operational efficiency and prolonging the lifespan of the customer’s investment.

The Challenge

While servicing the existing 3 x 110,000L bulk fuel farm, PETRO was tasked with increasing the on-site fuel storage capacity to better support the mine’s growing operational demands. The main objectives were:

  • Reducing on-site traffic by minimising the frequency of fuel deliveries.
  • Minimising downtime of the fuel system during expansion.
  • Ensuring seamless integration of new infrastructure with the existing fuel farm.

The expansion would enable the fuel supplier to refill less frequently, improving efficiency and reducing disruptions on-site.

The Solution

PETRO designed and delivered a tailored solution by expanding the existing fuel storage facility with an additional 8 x 68,000L bulk fuel tanks. All new tanks were strategically linked to form a unified, integrated fuel farm. Key elements of the project included:

1.     Optimised Design & Integration: Utilising the original tanker offloading point, PETRO developed a streamlined system that allows the fuel supplier to refill both the new tanks and the primary tank housing the pumping equipment, electrical control system, iPETRO Fuel Management System, and EVO tank gauging.

2.     Seamless Implementation: During the installation of the additional tanks, PETRO ensured minimal disruption to daily operations. The existing 3-tank fuel farm continued to function as normal, allowing the mine’s fleet to remain operational.

3.     Turnkey Delivery: PETRO handled the project end-to-end, including design, manufacturing, on-site commissioning, and staff training. All works were completed within an impressive 8-week timeframe.

The Outcome

The expanded fuel farm significantly enhanced the mine’s operational efficiency. Key achievements include:

  • Increased storage capacity: A total of 8 additional tanks were seamlessly integrated, allowing for larger fuel reserves on-site.
  • Reduced site traffic: Fewer refuelling trips were required, enhancing safety and minimising disruptions.
  • Minimal downtime: The project was executed swiftly, ensuring that daily operations continued uninterrupted throughout the upgrade.

This project is a prime example of PETRO Industrial’s one-stop-shop capability. By delivering an end-to-end solution, PETRO demonstrated exceptional efficiency, innovation, and a commitment to client success.

Conclusion

PETRO Industrial successfully expanded the fuel storage capacity for the mine site, achieving all project goals and delivering tangible benefits. This case highlights our ability to customise solutions that meet unique operational challenges while maintaining minimal downtime and maximising efficiency.

Looking to upgrade or expand your fuel storage?
Talk to our team today to discover how PETRO Industrial can design and deliver a customised fuelling solution for your business.

Previous article High-Quality Diesel Storage Solution for Power Generation in the Western Downs region of QLD
Next article Jet-A1 Fuel Storage Solution for an Aviation Facility

More case studies

  • iPETRO Link VMI
    June 17, 2025

    iPETRO Link Gateway with VMI Integration at Brisbane Airport

    The iPETRO Link Gateway is the ultimate bridge between your fuel storage and dispensing systems and the powerful iPETRO VMI Cloud dashboard. Engineered for seamless integration and total visibility, this device consolidates data from any Fluid Management or Automatic Tank Gauging (ATG) system—no matter how remote or distributed your sites are.

    Read now
  • This project is for a client that needs to transfer diesel and oil to an underground dispensing point 100m away.
    March 24, 2025

    Optimised Fuel and Oil Transfer Solution in Central Queensland.

    PETRO Industrial supplied and installed two Dual Compartment PETRO LT68 Tanks, designed to facilitate the storage and transfer of both diesel and oil. The entire system was pre-engineered in-house, allowing for rapid on-site installation and integration with the client's existing underground pipework.

    Read now